Member Login
| Park Condition Details |
| Work will begin soon on an extension of this trail that will take it under I-10, north to the top of the Addicks Dam where it will branch. There will be a branch to the east to Eldridge Parkway and a branch to the west connecting with Metro's Addicks Park and Ride Lot. This will make it possible for people to travel by bicycle from the neighborhoods around Wilcrest, Kirkwood, and Dairy Ashford to the park and ride lot, or to jobs in the oil company offices around Eldridge Parkway, if they choose to. |
| Park Condition Details |
Comments
I rode from the Memorial parking(near Eldridge) lot to Wilcrest, upper and lower.
RSS feed for comments to this post.